Block 164 Bukit Merah Central #03-3641 Singapore 150164
mail@tcpconsultants.com
Call us +65 6278 5007
Mon-Fri 8:30am to 6pm

New Futura

The Project involves the erection of 2-blocks of 36 storey apartments with common basement carparks and communal facilities at Leonie Hill Road (River Valley Planning Area). The Purpose of the Earth Control Measures, ECM is for the management of soil erosions, containment and treatment of...

Proposed Extension to Existing Crown Plaza Changi Airport

This project involves the earth control measure, ECM plan for piling and superstructure works of the proposed extension of a 10-storey hotel development to the existing Crown Plaza hotel on Lot 04594L PT MK31 at Airport Boulevard (Changi Planning Area)...

Jurong Rock Cavern

The Project involves the design and construction of the underground caverns, associated underground / above ground facilities and jetty of Phase 1 Jurong Rock Cavern at Banyan Basin Jurong Island, Singapore....

Facade Inspection at Ville Royale

The project is a periodic facade inspection of Ville Royale at 310, 312 River Valley Road, Singapore 238352. The Inspection is to ascertain the facade safety for the building occupancy. This is a 2 blocks of 4-storey residential building....

Building Inspection at Bishan Point Condominium

The project is a periodic visual inspection of Bishan Point Condominium at 61 Bright Hill Drive. The Inspection is to ascertain the structural safety for the building occupancy. The condominium consists of 1 block of 32-storey residential buildings with a total number of 164 units....