This project involves the earth control measure, ECM plan for piling and superstructure works of the proposed extension of a 10-storey hotel development to the existing Crown Plaza hotel on Lot 04594L PT MK31 at Airport Boulevard (Changi Planning Area)
Dragages Singapore Pte Ltd
Jun 2014 - Dec 2015
Erosion Control Measures Submission & QECP services
2015, Earth Control Measures